pacdrill

619-294-3682

Pacific Drilling Partners With HDR Engineering, Inc.

In early 2015 Pac Drill was chosen by HDR Engineering, Inc. (HDR) to attempt a challenging geotechnical investigation for the LOSSAN Double Track project in Rose Canyon, San Diego. The scope required borings to be advanced in multiple Creek Bed areas within the Railroad Right of way. Pacific Drilling Co and HDR worked closely to coordinate and organize equipment, and personnel from multiple companies and agencies to accomplish this two week project. Pac Drill utilized Bob’s Crane Service…

Read Article

Sediment Investigation With AECOM

In 2014, Pacific Drilling Co was selected by AECOM to assist with a multi year, multi phase investigation of the sediments within a coastal lagoon in northern San Diego County. Our team was tasked with collecting in-situ soil samples at depths of up to 40 feet below the mud line within the 915 acre Ecological Reserve. Challenges included moving equipment and personnel in a biologically sensitive tidal marsh environment over land and water. Drilling on land involved avoiding sensitive…

Read Article